Interconnection queues
- Berkeley Lab — Queued Up: 2026 Edition — Annual snapshot of U.S. transmission interconnection queues through the end of 2025: capacity by technology and region, agreement status, completion rates, and timelines.
- Berkeley Lab — Queue backlog eased somewhat in 2025 — Plain-language summary of the 2026 edition: 2,061 GW active, withdrawals, agreement volumes, and the over-five-year median timeline.
- Berkeley Lab — Queued Up 2026 slide deck (PDF) — Full data visualization deck behind the queue figures on this site.
Capacity and generation statistics
- EIA — Solar and wind to lead growth of U.S. power generation — EIA's outlook for wind and solar generation growth and planned capacity additions.
- EIA — U.S. battery capacity increased 66% in 2024 — Battery storage additions, cumulative capacity, and planned additions from EIA's generator inventory.
- pv magazine — EIA projects record 64 GW U.S. power capacity buildout in 2025 — Developer plans for 2025 by technology: solar, storage, wind, and gas.
- pv magazine — U.S. battery capacity rises 59% with 14 GW added in 12 months — EIA battery and solar growth through late 2025, with planned additions.
- IEA Wind TCP — USA Annual Report 2024 (PDF) — Installed U.S. wind capacity, generation share, and state activity for 2024.
- TaiyangNews — U.S. installed over 11 GW solar PV capacity in Q3 2025 — SEIA / Wood Mackenzie quarterly solar installations, segment detail, and the 2025–2030 outlook.
Siting, zoning, and permitting research
- NREL — Impact of Siting Ordinances on Land Availability for Wind and Solar Development (PDF) — The ordinance database and setback analysis behind the siting figures on this site.
- pv magazine USA — Local zoning ordinances play important role in predicting solar output — Readable summary of NREL's ordinance counts and setback findings.
Interconnection rules
- Troutman — Summary of FERC Order No. 2023 on generator interconnection reform — Cluster study process, timelines, deposits, penalties, and transition options under the federal rule.
- Burns & McDonnell — How FERC Order 2023 impacts the generation interconnection process — Practitioner view of the shift from serial to cluster studies and what it means for project timelines.
No YouTube channel is listed: no channel was verified to standard for this topic at the time of writing, so the section is omitted rather than guessed. Links are re-checked on each refresh; a link that stops resolving is removed, not left dangling.
energyzoning.com is offered for sale at $9,888.